In response to COVID-19, Congress allotted billions of dollars to the Education Stabilization Fund through the Coronavirus Aid Relief, and Economic Security (CARES) Act. Through the Elementary and Secondary School Emergency Relief (ESSER) Fund, the State of Tennessee received $4.2 billion to be spent on schools across the state in three phases. These emergency relief funds were provided to address the impact that COVID-19 has had, and continues to have, on elementary and secondary schools.

In 2016, a comprehensive facilities assessment was conducted to determine areas in need of correction at all physical campuses. LCS strategically prioritized the corrections based on need and severity. ESSER funding has allowed LCS to complete several capital improvement projects to improve our physical campuses, meet code compliance requirements, and provide safe learning environments for students and faculty.

Alternative Learning Academy

Project

Status

Roof, HVAC, and RTU Replacement

Underway (Design and Planning)

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed


Halls Elementary School

Project

Status

Roof, HVAC, and RTU Replacement

Underway (Design and Planning)

Doors and Window Repairs

Underway (Design and Planning)

Secure Entry

Planned

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed


Halls Junior High School

Project

Status

Roof Replacement (Shared with HHS)

Construction Nearing Completion

Facade Repairs (Shared with HHS)

Underway (Design and Planning)

Boiler and Cooling Tower Replacement

Underway (Design and Planning)

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed


Halls High School

Project

Status

Roof Replacement (Shared with HJH)

Completed

Gymnasium/Classroom Roof Replacement

Completed

CTE Building Roof Replacement

Completed

Barrel/Library Roof Replacement

Completed

HVAC/RTU Replacement

Completed

Code Upgrades

Completed

Facade Repairs (Shared with HJH)

Underway (Design and Planning)

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed

Athletic Facility - Baseball, Tennis, Softball

Concept Planned - Funding Discussions in Progress

HHS CAMPUS:  Weather proofing metal will replace the old facade around the top of the building at Halls High, Halls Jr. High, Ripley High, and Ripley Primary.

HHS CAMPUS:  A new athletic facility is being proposed on property adjacent to the school.  This will also provide much needed, paved parking for the campus.


Ripley Primary School

Project

Status

Roof Replacement

Underway (Design and Planning)

Doors and Window Repairs

Underway (Design and Planning)

Code Upgrades

Completed

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed

Beginning of Phased Paving Program

Ongoing


Ripley Elementary School

Project

Status

Roof, HVAC, and RTU Replacement

Underway (Design and Planning)

Single Point of Entry - Door Access Points

Completed

Repaved all parking lot surfaces

Completed


Ripley Middle School

Project

Status

Roof Replacement

Underway (Design and Planning)

Boiler Replacement

Underway (Design and Planning)

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed

Beginning of Phased Paving Program

Ongoing


Ripley High School

Project

Status

Cooling/Chiller Replacement

Completed

Boiler Replacement

Completed

Classroom Wing Roof Replacement

Completed

CTE Roof Replacement

Completed

Main Building Roof Replacement

Completed

Upper Level Window Replacement

Completed

2nd Floor Old Wing Renovation

Completed

Gymnasium/Classroom Roof Replacement

Underway (Design and Planning)

Facade Repairs

Underway (Design and Planning)

Front Entry Renovation - Canopy

Underway (Design and Planning)

Front Entry Renovation

Underway (Design and Planning)

Glass Front Entry

Planned

Single Point of Entry - Door Access Points

Completed

Updated/Increased # of Security Cameras

Completed

Paved Band Parking lot, bus lane, and concreted cafeteria loading dock

Completed

Football Stadium - Regulation Track

Concept Planned - Funding Discussions in Progress

RHS:  The two graphics above show the plans for renovation of the facade and front entry at RHS.  The upper facade will be wrapped with weatherproof metal to protect the building and improve aesthetics.  The existing canopy will be demolished and a new modern canopy will be constructed in its place.  The front entry doors will be replaced with new windows and doors.

RHS:  A new regulation track and football stadium is being proposed.  The new facility requires more space than is available at the current site.